Close
Shopping Categories
Search

CCHN Industry

CCHN is a trusted U.S. registered company in industrial automation & controls, CCHN's goal is helping saving your money by bypassing all kinds of local dealers/agents in buying industrial automation products from Chinese manufacturers directly. You will be enjoyed to get free tech support on how to choose, how to wire, how to commissioning with CCHN professional engineers. Shopping for your automation systems on CCHN one-stop online store now. The price on the website only for sample reference. for Mass order,please send the enquiry to us.

Blog

Foam cutting is a device for processing materials in the chemical industry such as foam and sponges. It mainly uses the high

...
CCHN Industry
 
Close
Shopping Categories
Search

CCHN Industry

CCHN is a trusted U.S. registered company in industrial automation & controls, CCHN's goal is helping saving your money by bypassing all kinds of local dealers/agents in buying industrial automation products from Chinese manufacturers directly. You will be enjoyed to get free tech support on how to choose, how to wire, how to commissioning with CCHN professional engineers. Shopping for your automation systems on CCHN one-stop online store now. The price on the website only for sample reference. for Mass order,please send the enquiry to us.

Blog

Foam cutting is a device for processing materials in the chemical industry such as foam and sponges. It mainly uses the high

...
3 Ton Electric Chain Hoist
 
Close
Shopping Categories
Search

3 Ton Electric Chain Hoist


$4662.15
Affordable price electric chain hoist can lift up to 3 ton (3000 kg) capacity, with a single lifting speed of 17.7 FPM, 14.4
SKU: CHN-ECH-03
Free Shipping Worldwide
Delivery date: 6-12 days

3 ton electrical power chain hoist with 3-phase 400V operation voltage fits perfectly with the industry standard. Because of stable load, this electric chain block hoist can be widely used in transport, construction, and other areas for lifting and moving heavy loads.

Feature

  • Shell: ATO electric chain hoist adopts aluminum alloy shell with high heat dissipation rate and fully enclosed design which is suitable for use in harsh working environments.
  • Limit switch: The limit switch device of the electric chain hoist is installed at the position of lifting and closing heavy loads, so that the motor stops automatically to prevent the chain from exceeding the limit and ensure safety.
  • Chain: The chain adopts FEC80 super heat-treated aluminum alloy chain, which can be used in harsh environments.
  • Hook: The hook of the electric chain hoist is hot forged with good strength that is not easy to break. The operation safety of the lower hook is ensured by its 360 degrees rotation and safety tongue piece.
  • Side Magnetic Brake Device: The magnetic force generator is the latest designed device that can generate magnetic force. It can brake immediately when the power is cut off, so as to ensure the braking safety when loading.

Specification

ModelCHN-SSDHL-0301SCHN-SSDHL-0302SCHN-SSDHL-0303S
Speed TypeSingle speed
Capacity3 ton
No. of Chain123
Lifting Speed17.7 FPM (5.4 m/min)14.4 FPM (4.4 m/min)7.2 FPM (2.2 m/min)
Motor Power3 kW3 kW1.5 kW
Rotation Speed1440 r/min
Standard Lifting Length3m, contact us for other length
Protection LevelIP54
Insulation GradeF
Power Supply (Optional)3 phase 220V/ 230V/ 240V/ 380V/ 400V/ 415V/ 480V
Control Voltage (Optional)24V/ 36V/ 48V
Diameter of Load Chain11.2 mm10 mm7.1 mm
Net Weight / Gross Weight122 kg / 133kg131 kg / 143 kg85 kg / 95 kg

Dimension

H: 845mm, A: 615mm, B: 295mm, D: 430mm, E: 265mm

Electric chain hoist dimension

Tips: How to lubricate electric chain hoist?

  1. Open the box where the equipment is installed, remove the tape on it, and then take the equipment out for trial operation. Don’t be in a hurry during operation, otherwise it will cause the wire rope to roll back and damage the limiter; at the same time, avoid the wire rope and the limiter. Direct contact with the frame, otherwise the limit switch will fail, causing the equipment to not operate normally.
  2. It is necessary to ensure that the fuselage of the equipment cannot be moved or rotated along the installation rod when it is installed; when the equipment is formally installed, it must be carefully inspected, and it can be installed only after the inspection is confirmed; the buffer on both sides of the track or I-beam The device must be installed neatly; the support points of the I-beam must be carried out according to the drawings, and it is necessary to check whether the link is firm.
  3. When the equipment is hoisted, it can be installed by crane according to the actual situation of the construction site. Of course, the hoist can also be used to set the hoisting of the pulley block. When hoisting, special attention must be paid to adopting protective measures, so as to ensure that the equipment is not damaged. After installation, it is necessary to conduct a test run. After turning on the power supply, first check whether the shipping direction of each motor is consistent with the direction of the control button.