Close
Shopping Categories
Search

10 hp (7.5 kW) AC Line Reactor, 3 Phase Output


$295.86
The 10 hp (7.5 kW) AC vfd line reactor at a comfartable price, with rated current 20A, three phase output, work voltage 380V,
SKU: CHN-OLR-7d5
Free Shipping Worldwide
Delivery date: 6-12 days

3 pole 10 hp (7.5 kW) with work frequency 50/60Hz, work voltage with 220V, 380V, 400V, 410V, 440V, 460V or 480V for selection, rated current 10A, for vfd. Excellent quality and reasonable price.
3-Phase Line output Reactor Specifications

BasicModelCHN-OCR-0020-0M35-0.4SC
Recommended VFD ModelGK3000-4T0075G (10 hp three phase VFD)
Phase3 Phase
Power10 hp (7.5 kW)
Weight3.7 kg
Technical ParametersWork Valtage380V (optional: 220V/ 240V/ 400V/ 415V/ 440V/ 460V/ 480V)
Work Frequency50Hz/60 Hz
Rated Current20 A
Max Current1.5 Times the Rated Current, Continued 60s
Inductance Value0.35 mH
MaterialAluminium/Copper (Optional)
Voltage Drop2%
Noise≤65dB
Insulation ClassClass F, H
Protection ClassIP00-IP22
Insulation Resistor≥100MΩ
Working EnvironmentOperation Environment-10℃~+45℃
Temperature Rise≤85K
Humidity≤90%RH, without condensation
Running Ambient Temperature-25℃~+45℃
Altittude≤2000m

7.5 kW 3-Phase Output Line Reactor Mounting Dimension

2hp 3 phase output reactor

Dimension(±5mm)
LDWW1HA×B
1109095701306×11

3-Phase Output Line Reactor Circuit Diagram

3 phase output line reactor circuit diagram.

Tips: How to Maintain Line Reactor?

Prevention of oil leakage: the oil tank of oil-immersed line reactor is filled with line reactor oil and oil-immersed line reactor is sealed with grease-proof rubber elements pressed by fastener in assembly. Poor sealing is the main cause for oil leakage of Line reactor, so user should pay attention it in maintenance.

Wetting prevention of line reactor: as a high voltage equipment, line reactor should have a good insulation. Oil-immersed type reactor is easy to be wetted, so wetting prevention is one of the main measures in maintenance of line reactor.

Oil replacement and drying treatment of line reactor: if the long idle time or operation time or other nature and human factors cause insulation deterioration of line reactor, water inflow or oil deterioration, oil replacement and drying treatment should be conducted to line reactor. Of line reactor: lift the body of line reactor out, drain sump oil, wash oil tank, and wash the greasy dirt on the body of line reactor if any. After drying, fill line reactor with oil and replace all grease-proof rubber seals The line reactor can be operated only after passing the test.